Core Drilling Equipment & Project Solutions | OEM/ODM Available | Export Packing & Documentation

What Information Is Needed for a Drilling Rig Quotation?

The seven inputs that turn a vague price into an accurate, comparable drilling rig quotation — and what a serious quote should contain in return.

2026-11-06 Buying Guide

Send a factory one line — "price for core drilling rig" — and you will get a one-line price back: a number attached to whatever machine the salesperson wants to move that month. Send the seven inputs below and the same factory has to engineer the answer: a machine, a tooling list and a lead time that fit your hole. The difference in quality between the two quotations is worth more than any discount.

1. The hole itself: depth and purpose. State the target depth and what the hole is for — mineral exploration coring, geotechnical investigation, water well, or geothermal. A 300 m exploration hole and a 300 m water well are different machines; the first is sized by rod series, the second by hole diameter and air.

2. Core size or casing plan. For coring work, name the rod series you want to run — the wireline sizes go BTW/BQ, NTW/NQ, HTW/HQ and PQ, each step up trading depth for core volume. For water wells, give the casing diameter and the finished hole size. This single line does more to size torque, pull force and pump than everything else combined.

3. Formation. Hard competent granite, broken fractured zones, clay, sand and gravel — each changes the recommendation. Formation decides bit type, whether you need following casing, mud circuit versus air hammer, and how much cooling the hydraulics need.

4. Power on site. Diesel only, grid power with voltage and frequency, or generator capacity. Half of the "wrong rig" stories start here — an electric rig ordered for a site that never had three-phase power, or a diesel rig whose compressor outgrows the site supply.

5. Access and terrain. Mountain tracks, mine drift, open farmland or city edge decides crawler, skid or truck chassis — and whether the rig must split for transport. Underground work needs frames that pass a drift and an electric head for the ventilation rules.

6. Programme scale. How many metres per year, how many sites, how many crews. A rig for a one-off 500 m programme is specified differently from one that will drill 10,000 m a year — feed stroke, spares depth and consumables planning all follow from this number.

7. Logistics. Destination port (or border crossing), and any timeline. You do not need to commit to dates to get a quotation, but the port tells the factory how to pack and document, and the season tells you whether the lead time actually works.

What a serious quotation contains in return — check any quote against this list: a line-by-line specification sheet (engine brand and rating, torque, rotation speed, feed and pull force, mast, winch, pump, chassis, shipping weight), a scope of supply that states what is included and what is optional, packing method, lead time in weeks from deposit, and the warranty terms in plain language. Our own step-by-step buying workflow describes what we send at each stage, including the written specification sheet that goes into the contract.

One more thing worth knowing: a good supplier will push back. If your depth target does not match the rod series you asked for, or the hole diameter needs a different class of machine than the one you saw on the website, the quotation should say so — with the corrected configuration next to it. For example, a 500 m NQ programme in hard rock maps to a specific crawler wireline rig, and a 260 m irrigation well in mixed ground maps to a very different water well machine. A quote that never disagrees with the inquiry is quoting the inquiry, not the hole.

Ready to try it? Send your hole parameters — depth, size, formation, power, access, programme and port — and we will return a matched configuration with the tooling list and lead time, usually within one working day.

What Information Is Needed for a Drilling Rig Quotation?

Need Technical Guidance for Your Project?

Describe the hole and the ground; we will answer with a configuration, not a brochure.

Ask an Engineer
Back to articles
WhatsApp