What to Check Before Buying a Core Drilling Rig: a 12-Point Field Checklist

Torque, pull force, feed stroke, cooling, spares — the twelve numbers and documents that decide whether a core rig fits your programme, before the price matters.

2026-11-06 Buying Guide

Two rigs with the same depth rating can behave completely differently on site. The difference lives in twelve details that rarely make the headline of a quotation. Run this checklist before you compare prices — it takes an hour and it decides most purchases correctly.

1. Depth rating against the right rod size. "1,000 m rig" is meaningless until you ask: 1,000 m on which rod? Wireline core sizes run BTW/BQ, NTW/NQ, HTW/HQ and PQ — each step up in diameter trades depth for core volume. A rig rated 1,000 m NQ will do far less on HQ and more on BQ, and a PQ string halves it again. Insist on the full BTW/BQ · NTW/NQ · HTW/HQ · PQ depth table — every rig page on this site publishes it, for example the CH-500 crawler rig at 600 / 500 / 300 m on BQ / NQ / HQ.

2. Torque and rotation speed as a pair. High torque at low rpm pulls casing and reams; high rpm with moderate torque cuts fast in competent rock with impregnated bits. If your programme mixes casing advance with coring, you want both ends of the curve — check the rated maximum torque and the top rpm together, never one alone.

3. Pull force against string weight, not against the catalogue. Estimate your heaviest string: rod weight per metre times depth, plus casing, plus friction in an awkward hole. The power-head lift should exceed that with margin — a rig that lifts its own string at 200 m may stall at 450 m in sticky clay.

4. Feed stroke. Longer stroke means fewer rod adds per shift. On deep holes the difference between a 1,800 mm and a 3,500 mm stroke is measured in whole shifts per week — it is why the long-stroke variant exists in our 1,000 m class.

5. Mast height and angle range. Check the mast takes your longest rod plus the head assembly with room to work, and that the angle range (45–90° on most crawlers, 0–180° on underground frames) covers the holes your programme actually specifies.

6. Winch capacity for your tooling. A wireline winch rated for 1,000 m of cable is not the same as one rated to recover a stuck inner tube from 1,000 m. Match the winch to the overshot load, not to the depth sticker.

7. Mud pump flow and pressure. For flushing cuttings in larger holes and for running a tricone or DTH set-up, check the pump model, not just "pump included". A BW160 and a BW250 are different machines on a hot day in clay.

8. Power options and fuel reality. Diesel or electric, 50 or 60 Hz, phase and voltage on site, and — for remote programmes — whether the rig can run off your generator with everything else switched on. Engines from major brands (Yuchai, Weichai, Yunnei) matter mostly for parts availability in your country; ask for the engine model in writing.

9. Chassis and transport weight. Crawler, skid or truck-mounted decides what terrain you can work; shipping weight and disassembled dimensions decide what the rig costs to move between projects and between countries. Both numbers belong in the quotation.

10. Hydraulics and cooling for your climate. Pumps, valves and cooling capacity should match the ambient temperature you drill in — water and air cooling for hot climates is not a luxury, it is the difference between a season and a summer of breakdowns.

11. Spares and consumables behind the machine. Ask who stocks the chuck jaws, seals, lifters and overshot parts, and how they are matched to your machine. A supplier that ties consumables to your serial number — as we do for rods, barrels and bits — saves you from the "nearly fits" part that ruins a core barrel.

12. The written specification sheet. Whatever the sales conversation says, the contract attaches a line-by-line spec: engine, torque, feed, pull, stroke, mast, winch, pump, chassis, weight. Specifications evolve as products are improved; the configuration that ships to you is the one fixed in that document. Any exporter who resists putting it in writing has answered your question already.

If you run these twelve checks, price becomes the last filter instead of the first — and it usually sorts two or three rigs that all passed. When you want a second opinion on a shortlist, send us the hole parameters and we will tell you honestly which of our models fits, and which one does not.

What to Check Before Buying a Core Drilling Rig: a 12-Point Field Checklist

Need Technical Guidance for Your Project?

Describe the hole and the ground; we will answer with a configuration, not a brochure.

Ask an Engineer
Back to articles
WhatsApp